Moss finishes $35M Phase 2 at 620 Brickell World Plaza

Getting your Trinity Audio player ready...
Moss finishes $35M Phase 2 at 620 Brickell World Plaza
Phase 2 expansion of Brickell World Plaza

Moss Construction has announced the completion of the $35 million Phase 2 expansion of Brickell World Plaza at 33 SE Seventh St.

Developed by Elm Spring, the project provides downtown Brickell with a much-needed parking resource for residents, local business employees and visitors to Brickell World Plaza.

“For more than 15 years, Moss has seen firsthand and been part of Brickell’s renaissance,” said Scott Moss, Moss Construction CEO. “It was a pleasure to work with the Elm Spring team, and to continue to be a part of Brickell’s changing skyline.”

Designed by HOK, the garage consists of a 12-story above grade parking garage and one below grade basement level valet garage. Built adjacent to the existing 600 Brickell World Plaza Tower, the two structures are connected at basement level under the existing active private drive. The façade of the garage features an exterior cladding system, made of precast architectural concrete panels and undulating perforated metal panels which are back lighted by color changing LED lights.

The 13-level garage structure contains 474 parking spaces located between the basement and 11th levels. The garage also will feature a 7,000-square-foot restaurant space on the first level, 8,600 square feet of retail space available on the 1B (Mezzanine) level and a plaza featuring green and hardscape spaces.


Connect To Your Customers & Grow Your Business

Click Here