Miami’s Community Newspapers White LogoInspire magazine
WED, NOV 18, 2026MIAMI, FL77°

School Board Awards $25 Million Project for Miami-Dade County’s First Net Zero Energy School Facility at Dr. Frederica S. Wilson/Skyway Elementary School

By Community Press Releases

At its regular Board meeting this past Tuesday, the School Board of Miami-Dade County awarded a $26.6 million project to H.A. Contracting Corp. for the comprehensive upgrade  and renovation of Dr. Frederica S. Wilson/Skyway Elementary School, which will become  the district’s first Net Zero Energy school. 

Built in 1972, Frederica S. Wilson Skyway Elementary is comprised of five permanent  buildings and covered walkways spanning 76,737 square feet on approximately eight  acres. The current facility provides student stations for 588 students and serves grades  Pre-K through eighth grade. 

The scope of this project includes the demolition and replacement of Building 1. The new 36,000 square foot, high performance building will house 400 student stations and feature  modern art and music labs, administration offices and a media center. Extensive  renovations to Building 4 will be performed, including high performance HVAC systems, new LED lighting, electric cooking equipment, as well as new exterior paint. 

Many sustainable design strategies were incorporated to achieve a Net Zero Energy and  Green/Sustainable facility, which includes optimal building orientation, high-performance  building envelope and HVAC systems, Low-E insulated glazing, water conserving fixtures,  and other energy efficient features.  

These measures at the school are projected to achieve a campus-wide Energy Use  Intensity (EUI) of 29.7, with the new classrooms reaching an impressive EUI of  approximately 20, which are significantly better than the National K-8 average of  approximately 56. EUI indicates how much energy a building consumes per square foot  per year. 

Beyond the energy-focused upgrades, the project will also include a new parking lot, new  tennis courts, putting green, and an upgraded basketball court.

To ensure the long-term integrity of the Net Zero Energy status, the project includes post  construction services such as extended manufacturer’s warranties and maintenance  services, an online Dashboard/Programming Hosting for Net Zero, and comprehensive  measurement and verification reporting system.  

The expected completion date of the project is September 2026. 

For the most up-to-date information, please download the Dadeschools Mobile App to your iPhone or Android device. Follow us on X, @MDCPS and @SuptDotres, on Instagram @miamischools and @suptdotres, and on Facebook at MiamiSchools.


Connect To Your Customers & Grow Your Business

Click Here


Community Press Releases

This story was brought to you by a member of the community. If you have any questions about the article or its contents feel free to contact the author. You too can submit a story here

Related articles

Advertise