Getting your Trinity Audio player ready...
|
The westbound SR 836 exit ramp to NW 37th Avenue will be closed for sign installation on Tuesday, July 7 and Wednesday, July 8 from 10 p.m. to 5 a.m. each night. The alternate date due to weather or other unforeseen circumstances is Thursday, July 9. Drivers should follow posted detour signs. Detour:
- Take exit to NW 42nd Avenue/LeJeune Road on right
- Turn right onto NW 42nd Avenue/LeJeune Road
- Take entrance to MIA on right
- Stay right to access NW 25th Street and turn right
- Continue on NW 25th Street to access NW 37th Avenue
Ramp Closure
The eastbound SR 836 exit ramp to NW 45th Avenue will be closed for sign installation on Tuesday, July 7 and Wednesday, July 8 from 10 p.m. to 5 a.m. each night. The alternate date due to weather or other unforeseen circumstances is Thursday, July 9. Drivers should follow posted detour signs. Detour:
- Take exit to southbound NW 42nd Avenue
- Turn right onto NW 7th Street
- Continue to NW 45th Avenue
The eastbound SR 836 exit ramp to northbound NW 42nd Avenue/LeJeune Road will be closed for sign installation restoration on Tuesday, July 7 and Wednesday, July 8 from 10 p.m. to 5 a.m. each night. The alternate date due to weather or other unforeseen circumstances is Thursday, July 9. Drivers should follow posted detour signs. Detours:
Drivers wishing to access MIA/northbound NW 42nd Avenue/LeJeune Road from eastbound SR 836 can:
- Continue eastbound on SR 836
- Take exit to southbound NW 27th Avenue
- Turn right onto NW 7th Street
- Turn right onto NW 42nd Avenue/LeJeune Road to continue northbound or access MIA
Ramp Closure
The westbound SR 836 exit ramp to southbound NW 87th Avenue will be closed for roadway restoration on Monday, July 6 from 10 a.m. to 3:30 p.m. Drivers should follow posted detour signs. Detours:
Drivers going westbound on SR 836 can:
- Take exit to NW 12th Street and turn left
- Turn left on NW 87th Avenue
Drivers exiting from southbound SR 826/Palmetto Expressway can:
- Take exit for NW 12th Street/NW 84th Avenue
- Turn left onto NW 12th Street
- Turn left onto NW 87th Avenue
Drivers exiting from northbound SR 826/Palmetto Expressway can:
- Take exit to northbound NW 107th Avenue
- Turn right onto NW 12th Street
- Turn right onto NW 87th Avenue
The entrance ramps to westbound SR 836 from southbound NW 87th Avenue will be closed for paving on Monday, July 6 through Wednesday, July 8 from 9 a.m. to 3:30 p.m. each day. Detours:
- Make U-turn
- Access westbound SR 836 ramp on right
A single lane on the eastbound SR 836 exit ramp to NW 87th Avenue will be closed for roadway restoration on Monday, July 6 through Friday, July 10 from 9 a.m. to 3:30 p.m. each day.
Up to two lanes on westbound SR 836 at NW 17th Avenue will be closed for Open Road Tolling equipment maintenance on Monday, July 6 and Tuesday, July 7 from 9 p.m. to 5 a.m.
A single lane on northbound and southbound NW 87th Avenue between NW 8th Street and NW 13th Street will be intermittently closed for roadway restoration and landscaping on Monday, July 6 through Friday, July 10 from 9 a.m. to 3:30 p.m. each day.
Street Lane Closure
Up to two lanes on eastbound and westbound NW 12th Street between NW 87th Avenue and NW 82nd Avenue will be intermittently closed for roadway restoration and landscaping on Monday, July 6 through Friday, July 10 from 9 a.m. to 3:30 p.m. each day.
Note: The following closures are part of the I-395/SR 836/I-95 Design-Build Project. This schedule may change due to bad weather or other unforeseen conditions.
MONDAY, JULY 6 THROUGH FRIDAY, JULY 10 – The eastbound SR 836 ramp to northbound I-95 will be closed between the hours of 9 p.m. and 5:30 a.m. Drivers can:
- Go south on I-95
- Access the NW 8 Street ramp, then exit at the NW 8 Street/PortMiami ramp
- Turn left at NW 8 Street
- Turn left at NW 3 Avenue to access the northbound I-95 ramp
MONDAY, JULY 6 THROUGH FRIDAY, JULY 10 – The eastbound SR 836 ramp to northbound NW 17 Avenue will be closed between the hours of 9 p.m. and 6 a.m. Drivers can:
- Exit at NW 27 Avenue, then turn north on NW 27 Avenue
- Turn right on NW 20 Street to connect with NW 17 Avenue
MONDAY, JULY 6 THROUGH FRIDAY, JULY 10 – NW 17 Avenue will be closed between NW 7 Street and the north side of SR 836 between the hours of 8 p.m. and 5:30 a.m.
Drivers on northbound NW 17 Avenue heading west on SR 836 can:
- Turn west on NW 7 Street
- Turn right on NW 27 Avenue to access the SR 836 west entrance ramp
Drivers on northbound NW 17 Avenue continuing north can:
- Turn west on NW 7 Street, then turn right on NW 22 Avenue
- Turn right on NW 20 Street to connect with NW 17 Avenue
Drivers on southbound NW 17 Avenue continuing south can:
- Turn west on NW 20 Street, then turn left on NW 22 Avenue
- Turn left on NW 7 Street to connect with NW 17 Avenue
MONDAY, JULY 6 THROUGH FRIDAY, JULY 10 – Two lanes on eastbound SR 836 from NW 20 Avenue to east of NW 17 Avenue will be closed every day between the hours of 8 p.m. and 5:30 a.m.
SUNDAY, JULY 6 THROUGH FRIDAY, JULY 10 – Two westbound lanes on SR 836 from I-95 to NW 17 Avenue will be closed between the hours of 8 p.m. and 5:30 a.m. One lane will also be closed between the hours of 9 a.m. and 2 p.m. from I-95 to the Miami River.
For additional information, please contact Community Outreach Specialist Oscar Gonzalez at 786-280-0983. Additional project information can be found on the project website, www.I-395.com.
MDX SR 874/Don Shula Expressway
As part of the SR 874 Ramp Connector to SW 128th Street project, the following lane closures are scheduled:
Street Closure
Traffic eastbound and westbound on SW 128th Street will be stopped intermittently by flagging operations from SW 137th Avenue to the Cul-de-Sac at the east end of 128th Street, for drainage, utilities work, and roadway construction on Monday, July 6 through Friday, July 10 from 9 a.m. to 3:30 p.m. each day.
Complete Street Closure
SW 128th Street will be fully closed east of SW 122nd Avenue to the Cul-de-Sac at the end of SW 128th Street for roadwork and utilities work on Monday, July 6 through Friday, July 10 from 9 p.m. to 5:30 a.m. each night. Access to local traffic will be provided at all times.
Street Closure
One traffic lane of northbound and/or southbound SW 137th Avenue will be closed between SW 124th Street and SW 131st Street for roadway and signal construction on Monday, July 6 through Friday, July 10 from 9:30 a.m. to 3:30 p.m. and 9 p.m. to 5:30 a.m. each day.
Complete Intersection Closure
The intersection at SW 122nd Avenue and SW 128th Street will be fully closed for roadway reconstruction on Monday, July 6 through Friday, July 10 from 7 p.m. to 7 a.m. each night and Saturday, July 11 from 9:30 a.m. to 5:30 p.m. Access to local traffic east of SW 122nd Avenue will be provided at all times. Drivers should follow posted detour signs.
Detours:
Drivers going south on SW 122nd Avenue to access properties west of SW 122nd Avenue can:
- Turn right on SW 120th Street
- Turn left on SW 127th Avenue
- Turn left on SW 128th Street
Drivers going north on SW 122nd Avenue to access properties west of SW 122nd Avenue can:
- Turn left on SW 130th Street
- Turn right on SW 127th Avenue
- Turn right on SW 128th Street
NOTES:
– To accelerate critical roadway construction projects and take advantage of the reduction of traffic resulting from the Stay at Home Order, closures may extend up to two (2) hours prior and/or two (2) hours after the noticed time.
– Please note that all scheduled activities are subject to change due to weather or other unforeseen circumstances.